Traffic Advisory for the Week of September 8 - 14, 2025
September 5, 2025Road Safety Reminder for the week of September 8 - 14, 2025
Use Your Headlights
- Any time conditions (clouds, rain, dust, smoke, fog, etc.) prevent you from seeing other vehicles
- In darkness and when visibility does not allow clear recognition of a person or vehicle from a distance of 500 feet
- When the vehicle is operated from sunset to sunrise
- When a regulatory (white) road sign is posted stating headlights must be on
- To increase your vehicle's visibility to others while driving – even on bright days and especially when the sun is low on the horizon
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3201 | Driving Without Headlamps When Required | $80.00 |
| 3342A | Headlamps Required | $40.00 |
| 3342B | Failure to Dim Headlamps for Oncoming Vehicles | $50.00 |
Guam Construction Update for the week of September 8 - 14, 2025
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4 Route 10
Construction activities will continue along Route 10, between the Route 4 intersection and Pay-less through to the Route 32 intersection, from September 8 - 13, 2025. Intermittent lane clo-sures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
Motorists are advised to expect traffic delays, slow down and comply with posted speed lim-its when traveling through the work zone. Please remain alert for uneven pavement surfaces and temporary steel plates and drive safely at all times.
No construction activities are scheduled for Sunday, September 14, 2025.
Route 27 (Harmon Loop) & Route 25 (Alageta Street) Grass Cutting - Dededo
The DPW HMC crew will be grass cutting Route 27 (Harmon Loop) and Route 25 (Alageta Street), weather permitting. Work will occur between 9:00 AM and 3:00 PM Monday - Friday. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
Islandwide Grass Cutting Maintenance Project
The DPW contractor will be grass cutting at the following locations between 9:00 AM and 3:00 PM, weather permitting:
- Saturday, 9/6/25 – Wednesday, 9/10/25: Route 1, Marine Corps Drive
- Thursday, 9/11/25: Route 17, Cross Island Road
- Friday, 9/12/25 - Monday, 9/15/25: Route 6 (Asan-Maina/Piti)
The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
File an Americans with Disabilities Act (ADA) Report
Office of the Governor of Guam
Meet our Leaders