Traffic Advisory for the Week of November 3 - 9, 2025
October 31, 2025Road Safety Reminder for the week of Week of November 3-9, 2025
Center Left Turn Lanes
A center left turn lane is located in the middle of a two-way street. It is marked on both sides by two painted lines. The inner line is broken, and the outer line is solid. Use the center left turn lane to prepare for and make a left turn or U-turn. It is not a regular traffic lane.
To turn left from this lane:
- Look for other vehicles coming toward you in the center left turn lane
- Signal
- Look over your shoulder to check your blind spots
- Merge completely into the center left turn lane so you do not block traffic
- Turn when it is safe
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3314 | Improper Lane Usage | $80.00 |
| 3324 | Failure to use Signal – Start/Stop/Turn | $80.00 |
Guam Construction Update for the week of November 3-9, 2025
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10
Construction activities will continue along Route 10, between the Route 4 intersection and Route 32 and extending up to Tenorio Street (Pochon Chicken Mangilao), from November 3 to November 8, 2025. Intermittent lane closures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
Motorists are advised to expect traffic delays, slow down and comply with posted speed lim-its when traveling through the work zone. Please remain alert for uneven pavement surfaces and temporary steel plates and drive safely at all times.
No construction activities are scheduled for Sunday, November 9, 2025.
Islandwide Safety Improvements on Primary Roads (Striping and Marking) TO-1
Route 1/Route 6 Intersection, Maina
Construction activities will continue at the Route 1/Route 6 Intersection, between Slingstone Coffee+Tea and Pacific Welding Services, from November 3 to November 8, 2025. Intermittent lane closures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
No construction activities are scheduled for Sunday, November 09, 2025.
Islandwide Primary Roads Paving and Pavement Markings TO-3
Route 30A
Construction activities will continue along Route 30A, between the Pay-Less Oka and St. Antho-ny Church, Tamuning, from November 3 to November 8, 2025. Intermittent lane closures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
No construction activities are scheduled for Sunday, November 9, 2025.
Islandwide Primary Roads Paving and Pavement Markings TO-3
Route 32
Construction activities will continue along Route 32, between Route 10 /Route 32 intersection and Campus Drive from November 3 to November 8, 2025. Intermittent lane closures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
No construction activities are scheduled for Sunday, November 9, 2025.
Islandwide Primary Roads Paving and Pavement Markings TO-3
Route 8
Construction activities will continue along Route 8, from Route 1 /Route 8 intersection to Ben-son, Barrigada, from November 3 to November 8, 2025. Intermittent lane closures in both direc-tions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
No construction activities are scheduled for Sunday, November 9, 2025.
Islandwide Primary Roads Paving and Pavement Markings TO-3
Route 2A
Construction activities will continue along Route 2A, Santa Rita, from November 3 to November 8, 2025. Intermittent lane closures in both directions are expected during work hours: Mon–Fri, 9:00 a.m.–4:00 p.m.; Sat, 7:00 a.m.–6:00 p.m.
No construction activities are scheduled for Sunday, November 9, 2025.
Route 1 Bush Cutting from Polaris to Chief Quipuha Park
The DPW HMC crew will be bush cutting along Route 1 starting from Polaris, working north to-wards Chief Quipuha Park. Work will occur between 9:00 AM and 3:00 PM Monday – Friday. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
File an Americans with Disabilities Act (ADA) Report
Office of the Governor of Guam
Meet our Leaders