Traffic Advisory for the Week of March 17 - 23, 2025

March 14, 2025

Road Safety Reminder for the week of March 17 - 23, 2025

Pedestrian Safety

8 Safety Tips for Drivers:

  1. Look out for pedestrians everywhere, at all times.

  2. Use extra caution when driving in hard-to-see conditions, such as nighttime or bad weather.

  3. Slow down and be prepared to stop when turning or otherwise entering a crosswalk.

  4. Yield to pedestrians in crosswalks and stop well back from the crosswalk to give other vehicles an opportunity to see the crossing pedestrians so they can stop too.y

  5. Never pass vehicles stopped at a crosswalk. There may be people crossing where you can’t see.

  6. Never drive under the influence of alcohol and/or drugs.

  7. Follow the speed limit, especially around people on the street, in school zones and in neighborhoods where children are present.

  8. Be extra cautious when backing up and look for pedestrians.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3328 Failure to Yield to Pedestrian $200.00
3329 Fail to Yield to Pedestrian (Intersection) $200.00
3301A Imprudent Driving $80.00
3301F Speeding (per mph over the speed limit) $8.00
3323 Unsafe Starting or Backing $80.00

 

Guam Construction Update for the week of March 17 - 23, 2025

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

From Monday, 3/17/25 to Friday, 3/21/25 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.

 

Islandwide Safety Improvements on Primary Roads (Striping and Marking) TO-1 Route 1 from Route 1/Route 6 to Route 1/Route 11 Intersections

General construction activities will continue for the Route 1 Striping and Marking Project along Route 1, between the Route 1/Route 6 and Route 1/Route 11 intersections project. These activities will involve lane shifts and lane closures.

From Monday 03/17/25 through Friday 03/21/25 from 9:00 AM to 4:00 PM, the contractor will work on Pavement Striping and Markings, from Calachucha St. (before Day Buy Day Store) to Kalackac Road (after Fish Eye Marine Park). There will be multiple intermittent closures on northbound and southbound lanes.

No Construction activities are scheduled for Saturday- Sunday, 03/22/25 – 03/23/25.

Motorists are advised to exercise caution and follow the directions of flaggers when present. Alternate routes and/or adjusting drive times when feasible are encouraged.

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders