Traffic Advisory for the Week of June 17 - 23, 2024

June 14, 2024

Road Safety Reminder for the week of June 17 - 23, 2024

Backing Out/Parking

Before you back out of a driveway or parking spot, prevent backovers by walking around your vehicle to check for children running and playing.

When using a backup camera, remember that kids, pets, and objects may be out of view but still in the path of your vehicle. When children play, they are often oblivious to cars and trucks around them. They may believe that drivers will watch out for them.

Furthermore, every vehicle has a blind zone. As the size and height of a vehicle increases, so does the “blind zone” area. Large vehicles, trucks, SUVs, RVs, and vans are more likely than cars to be involved in backovers.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3323 Unsafe starting or backing $80.00

 

Guam Construction Update for the week of June 17 - 23, 2024

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

From Monday, 6/17/24 to Saturday, 6/22/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.

 

Route 14 Resurfacing from Route 1 to Route 14B – Tamuning

From Monday, 6/17/24 to Saturday, 6/22/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio). During this time, expect minimal lane shifts and intermittent lane closures.

 

Route 10 Pavement Repairs – Barrigada

From Monday, 6/17/24 to Saturday, 6/22/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue pavement repairs along Route 10 starting from Leyang Road to the Route 8/10/16 Tri-Intersection. There will be intermittent lane closures along both sides of traffic.

 

Route 10 Striping – Mangilao

The DPW contractor may continue striping Route 10 starting in Mangilao working north towards Barrigada, weather permitting. Work would occur between 7:00 AM and 4:00 PM. There will be intermittent lane closures.

 

Islandwide Grass Cutting Maintenance Project

The DPW contractor will be grass cutting at the following locations, weather permitting:

  • Monday, 6/17/24 – Tuesday, 6/18/24: Route 3

  • Tuesday, 6/18/24 – Wednesday, 6/19/24: Route 16 – Route 8

  • Thursday, 6/20/24: Route 10

  • Friday, 6/21/24 – Sunday, 6/23/24: Route 15

  • Sunday, 6/23/24: Route 6 & Route 7

Work will occur between 7:30 AM and 5:00 PM. There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

 

Route 28 (Y Sengsong) Roadside Maintenance – Dededo

The DPW HMC crew will be performing roadside maintenance on Route 28 (Y Sengsong) between Chalan Koda and the DPW Coral Pit. Work will occur between 7:00 AM and 3:30 PM. There will be intermittent lane closures and lane shifts. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

 

Route 1 Roadside Maintenance – Adelup to Piti

The DPW HMC crew will be performing roadside maintenance on Route 1 from Adelup to Piti. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews..

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders