Traffic Advisory for the Week of July 8 - 14, 2024

July 5, 2024

Road Safety Reminder for the week of July 8 - 14, 2024

Dealing with Speeding and Aggressive Drivers

Speeding behavior and aggressive drivers may not only affect the speeder—it can also affect other drivers, pedestrians, and bicyclists. Here are some tips for encountering speeders on the road:

  • If you are in the left lane and someone wants to pass, move over and let them by.

  • Give speeding drivers plenty of space. Speeding drivers may lose control of their vehicle more easily.

  • Adjust your driving accordingly. Speeding is tied to aggressive driving. If a speeding driver is tailgating you or trying to engage you in risky driving, use judgment to safely steer your vehicle out of the way.

  • Call the police if you believe a driver is following you or harassing you.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3301A Imprudent Driving $70.00
3301B Fail to Stop Within Assured Clear Distance $400.00
3301C Maximum Speed Limit (45 mph) $80.00
3301F Speeding (per mph over the speed limit) $8.00

 

Guam Construction Update for the week of July 8 - 14, 2024

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

From Monday, 7/8/24 to Saturday, 7/13/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.

 

Route 14 Resurfacing from Route 1 to Route 14B – Tamuning

From Monday, 7/8/24 to Saturday, 7/13/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio). During this time, expect minimal lane shifts and intermittent lane closures.

 

Route 10 Pavement Repairs – Barrigada

From Monday, 7/8/24 to Saturday, 7/13/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue pavement repairs along Route 10 starting from Leyang Road to the Route 8/10/16 Tri-Intersection. There will be intermittent lane closures along both sides of traffic.

 

Route 10 Striping – Barrigada/Mangilao

Motorists are advised that the DPW contractor will continue striping along Route 10 from the Route 8/10/16 Tri-Intersection to UOG (Route 32), weather permitting. Work will occur between 7:00 AM and 4:00 PM. There will be intermittent lane closures.

 

Islandwide Grass Cutting Maintenance Project

The DPW contractor will be grass cutting at the following locations, weather permitting:

  • Monday, 7/8/24 – Wednesday, 7/10/24: Route 15

  • Thursday, 7/11/24 – Friday, 7/12/24: Route 6 & Route 7

  • Saturday, 7/13/24 – Sunday, 7/14/24: Route 1 from Hagatna – AAFB

Work will occur between 7:30 AM and 5:00 PM. There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

 

Y Sengsong Maintenance – Dededo

The DPW HMC crew will be clearing gravel and debris at intersections along Y Sengsong Road during the week. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

Islandwide Village Streets Paving  – Chalan Koda, Dededo/Yigo

The DPW contractor will continue paving portions of Chalan Koda during the week. Work will occur between 7:00 AM and 4:00 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders