Traffic Advisory for the Week of February 2-8, 2026
January 30, 2026Road Safety Reminder for the week of February 2-8, 2026
Signaling
Always signal when turning left or right, changing lanes, slowing down, or stopping. Signaling lets other drivers, motorcyclists, bicyclists, and pedestrians know your intentions. Signals may be given by hand-and-arm positions or using the vehicle’s signal lights. If bright sunlight makes the signal lights hard to see, also use hand-and-arm signals.
Signal:
-
During the last 100 feet before reaching the turning point (left or right turn)
-
Before every lane change. Check your mirrors, look over your shoulder, and check your blind spot before changing lanes.
-
Before pulling next to the curb or away from the curb
-
When you change directions
-
Even when you do not see other vehicles. A vehicle you do not see may suddenly appear and hit you.
-
If you plan to turn beyond an intersection. Start signaling when you are in the intersection. If you signal too early, the other driver may think you plan to turn into the intersection, and they may pull out in front of you. Remember to cancel your signal after turning.
Arm Signals For STOPS and TURNS (Diagram Reflects Rear of Vehicle)

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3324 | Failure to Use Signal – Start/Stop/Turn | $80.00 |
Guam Construction Update for the week of February 2-8, 2026
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10
Construction activities will continue along Route 10. Intermittent lane closures in both directions are expected during work hours:
-
Monday–Friday, 2/02/2026 –2/06/2026: 9:00 a.m.–4:00 p.m.
-
Saturday, 2/7/26: No Work
-
Sunday, 2/8/2026: 7:00 AM–6:00 PM
Locations:
Contractor crews will be working at various locations along Route 10 throughout the week.
-
Primary areas:
-
Between Route 4 and Payless for manhole adjustments
-
Between Route 15 and the Tri-Intersection for striping work
Motorists are advised to expect traffic delays and plan their travel time accordingly. Please slow down and comply with posted speed limits when traveling through the work zone. Remain alert for uneven pavement surfaces and temporary steel plates, and drive safely at all times.
Route 4 Replacement of Ylig Bridge (Phase 2) – Ylig Memorial
General construction activities will continue for the Ylig Memorial Project. These activities will not affect the flow of traffic.
The contractor, Korando Corporation, will be working from 7:00 AM till 4:00 PM on weekdays only. No construction activities are scheduled for Saturdays and Sundays.
DPW HMC Grass Cutting
The DPW HMC crew will be grass cutting the following locations, weather permitting:
-
Roadside maintenance bush cutting Route 1 from Polaris (Piti) to Adelup
-
Side cutting Route 4 from Inalåhan to Malesso'
Work will occur between 9:00 AM and 3:00 PM Monday - Friday.
File an Americans with Disabilities Act (ADA) Report
Office of the Governor of Guam
Meet our Leaders