Traffic Advisory for the Week of February 10 - 16, 2025

February 7, 2025

Road Safety Reminder for the week of February 10 - 16, 2025

Know What Is at Your Side

Any time you come to a place where people may cross or enter your path or a line of traffic meets another, you should look to the left and right sides of your vehicle to make sure no one is coming. Always look to each side of your vehicle at intersections and crosswalks.

At intersections:

  • Look both ways even if other traffic has a red traffic signal light or a stop sign

    • Look to the left first, since vehicles coming from the left are closer to you than vehicles coming from the right.

    • Look to the right.

    • Take one more look to the left in case there is a pedestrian, bicyclist, or vehicle you did not see the first time.

  • Do not rely on traffic signal lights. Some drivers do not obey traffic signal lights. Before you enter an intersection, look left, right, and ahead for approaching traffic.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3325 Failure to Yield at Intersection $100.00
3329 Fail to Yield to Pedestrian (Intersection) $200.00
3339G Failure to Yield Right-of-Way $80.00

 

Guam Construction Update for the week of February 10 - 16, 2025

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

From Monday, 2/10/25 to Friday, 2/14/25 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.

 

Islandwide Village Street Pavement Resurfacing – Agat Village

The DPW HMC crew will be milling and paving North Santa Cruz St and Calle de Los Marteres St in Agat Village. Work will occur between 7:00 AM and 4:00 PM. The DPW asks motorists and res-idents to proceed with caution and remain alert for traffic control signs and work crews.

 

Route 1 Striping – Route 29 to AAFB

The DPW HMC crew will be striping Route 1 Marine Corps Dr from the Our Lady of Lourdes Catholic Church to Andersen Air Force Base. Work will occur between 8:00 AM and 3:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.

 

Route 1 Grass Cutting – Upper Tumon

The DPW HMC crew will be grass cutting Route 1 Marine Corps Dr starting in Upper Tumon work-ing north. Work will occur between 8:00 AM and 3:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.

 

Route 15 Grass Cutting – Mangilao/Yigo

The DPW HMC crew will be grass cutting Route 15 starting in Mangilao working north towards the AAFB Back Gate. Work will occur between 8:00 AM and 3:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders