Traffic Advisory for the Week of August 18 - 24, 2025

August 15, 2025

Road Safety Reminder for the week of August 18 - 24, 2025

Traffic Signal Lights (Flashing/Not Working)

Flashing Red

Flashing Red light is the same as a “STOP” sign. Come to a complete stop at the intersection before proceeding.

Flashing Yellow

Flashing Yellow light means "SLOW DOWN" and proceed with caution. Slow down and be alert before entering the intersection. Yield to any pedestrians, bicyclists, or vehi-cles in the intersection. You do not need to stop for a flashing yellow traffic signal light.

Traffic Signal Light Not Working (Blackout)

Traffic Signal Light Not Working (Blackout) When the traffic signal lights are not working properly, whether flashing red or no lights are showing, treat the intersection as if it is controlled by a “STOP” sign in all directions. This means that all traffic must come to a complete stop prior to proceeding, obeying the rules for a “STOP” sign.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3335 Disobey Flashing Traffic Light $80.00
3339A Disobey Traffic Signal Light $80.00
3339F Failure to Comply with Peace Officer/Inst $100.00

 

Guam Construction Update for the week of August 18 - 24, 2025

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Islandwide Safety Improvements on Primary Roads (Striping and Markings) TO-2 Route 1 from Route 6 (Adelup) to Alupang Towers - Hagåtña

Pavement striping and marking activities will continue along Route 1, from Route 8 to Alupang Beach Tower, from Monday, 08/18/2025 to Friday, 08/22/2025, work hours will be from 9:00 AM to 4:00 PM. Intermittent lane closures in both directions are expected during work hours. Motorists are advised to plan accordingly and proceed with caution.

 

No construction activities are scheduled for Saturday, August 23, and Sunday, August 24, 2025.

 

Islandwide Primary Roads Paving and Pavement Markings TO-4 Route 10

Construction activities will continue along Route 10, between the Route 4 intersection and Fa-ther Duenas, from August 18–23, 2025. There will be lane closures between 9:00 AM – 4:00 PM Monday-Friday and 7:00 AM – 4:00 PM Saturday. Motorists should expect delays and drive with caution.

No construction activities are scheduled for Sunday, August 24, 2025.

 

Route 4 Paving – Malesso'

The DPW HMC crew will be preparing Route 4 from the Merizo Bell Tower to Hemlani Apart-ments for paving between 9:00 AM and 3:00 PM. There will be intermittent lane closures. Pav-ing is tentatively scheduled for the following week. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

 

Route 1 Grass Cutting from Adelup to Polaris

The DPW HMC crew will be grass cutting Route 1 from Adelup to Polaris. Work will occur be-tween 9:00 AM and 3:00 PM. The DPW asks motorists to please proceed with caution and re-main alert for traffic control signs and work crews.

 

Islandwide Grass Cutting Maintenance Project

The DPW contractor will continue grass cutting at the following locations between 9:00 AM and 3:00 PM, weather permitting:

  • Route 1, Marine Corps Dr (Tamuning/Dededo/Yigo)
  • Route 15 (Mangilao/Yigo)
  • Route 3 (NCTS, Dededo)

The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders