Traffic Advisory for the Week of September 4 - September 10

September 1, 2023

Road Safety Reminder for the week of September 4 - 10, 2023

Hydroplaning

Hydroplaning occurs when driving in wet or rainy conditions. Hydroplaning is a vehicle riding on water because the tires lose all contact with the road. A slight change of direction, applying the brakes, or a gust of wind could throw the vehicle into a skid.

To avoid hydroplaning:

  • Drive slowly.
  • Steer around standing water, if possible.
  • Slow down if you hear sloshing sounds from the tires.
  • Slow down when changing lanes or direction.

If your vehicle starts to hydroplane:

  • Slow down gradually.
  • Do not use the brakes. Sudden braking may cause you to lose control of your vehicle.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3301A Imprudent Driving $70.00
3301B Fail to Stop Within Assured Clear Distance $400.00

 

Guam Construction Update for the week of September 4 - 10, 2023

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

 

Route 5 and Portion of Route 12, Reconstruction and Widening (Route 2A to Naval Magazine/Route 12) – Santa Rita

Construction activities will continue along Route 5 from Route 2A to Route 17 with intermittent lane closures. Motorists are advised to slow down while driving through this area.

 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

There is a full road closure between Congressman Palting Loop and Pale San Vitores Road for the construction of a new retaining wall and widening of Ypao Road. Motorists will have to take alternate routes. The public is advised not to enter the construction area.

 

Route 14 Resurfacing from Route 1 to Route 14B – Tamuning

From Monday, 9/4/23 to Friday, 9/8/23 between 9:00 AM and 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures at the following locations:

- ET Calvo Memorial Parkway/Route 1 Intersection to The Carpet Store
- Route 1/Route 14 intersection - Northbound
- Route 14/GPO intersection
- Route 14 from Great National Insurance to the Route 30A Intersection

The contractor will also continue surveying along Route 14. Flaggers will be present to assist surveyors.

On Saturday, September 9, 2023, between 9:00 AM to 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures as the contractor will continue work at the following locations:

- Route 14/GPO intersection
- Route 14 from Great National Insurance to the Route 30A Intersection

Starting at 5:00 PM, the contractor will be milling and paving along Route 14 (Chalan San Antonio) from Pacific Tyre to California Mart. All traffic will be diverted to the GPO side allowing for both ways of traffic. Access to businesses will be maintained. Construction activities will be completed with all lanes open on Sunday, September 10, 2023 at 6:00 AM.

On Sunday, September 10, 2023, starting at 5:00 PM, the contractor will be milling and paving along Route 14 (Chalan San Antonio) from Ruby Tuesday to Community First FCU. All traffic will be diverted to the Sakura Dining side allowing for both ways of traffic. Access to businesses will be maintained. Construction activities will be completed with all lanes open on Monday, September 11, 2023 at 6:00 AM.

File an Americans with Disabilities Act (ADA) Report

Page Banner
With your help, we can make it easier for persons with disabilities to get around Guam
Learn More

Office of the Governor of Guam

Lou Leon Guerrero
Lou Leon Guerrero Governor
Josh Tenorio
Josh Tenorio Lt. Governor
Visit the Governor of Guam Website

Meet our Leaders

Vincent P. Arriola
Vincent P. Arriola Director
Linda J. Ibanez
Linda J. Ibanez Deputy Director
Learn more about our Leaders