Road Safety Reminder for the Week

Traffic Signal Lights (Flashing/Not Working)


Flashing Red light is the same as a “STOP” sign.Come to a complete stop at the intersection before proceeding.

Flashing Yellow light means "SLOW DOWN" and proceed with caution. Slow down and be alert before entering the intersection. Yield to any pedestrians, bicyclists, or vehicles in the intersection. You do not need to stop for a flashing yellow traffic signal light.

Traffic Signal Light Not Working (Blackout)
When the traffic signal lights are not working properly, whether flashing red or no lights are showing, treat the intersection as if it is controlled by a “STOP” sign in all directions. This means that all traffic must come to a complete stop prior to proceeding, obeying the rules for a “STOP” sign.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3335 Disobey Flashing Traffic Light $80.00
3339A Disobey Traffic Signal Light $80.00

 

 

Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
 

Heavy Haul Cargo Transport for Ukudu Power Plant

Please drive with caution as road crews will be removing medians on Marine Drive Route 1/ Aspinall Avenue (near Hagåtña Boat Basin) on Monday, January 23. Subscribe to poweronthemove.org to stay informed.
 

Route 28 Rehabilitation from Route 1 to Bumuchachu Street – Dededo

From Monday, 1/23/23 – Friday, 1/27/23 from 8:30 AM to 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures along Route 28 (Ysengsong Road) from Buena Vesta Avenue to Bumuchachu Street.
 

Route 5 and Portion of Route 12, Reconstruction and Widening (Route 2A to Naval Magazine/Route 12) – Santa Rita

Motorists are advised of possible lane closures throughout the week between the hours of 8:30 AM and 4 PM Tuesday, 1/17/2023 to Friday, 1/20/2023.
 

Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning

Beginning October 2022 to May 2023, there will be full road closure between Congressman Palting Loop and Pale San Vitores Road. Motorists will have to take alternate routes.
 

Islandwide Guardrail Repair and Replacement – Route 4 between Route 1 and Route 10

Motorists are advised of possible lane closures throughout the week between the hours of 8:30 AM and 4:00 PM Monday, 1/23/2023 to Friday, 1/27/2023.
 

Islandwide Village Street Pavement Resurfacing – Dededo

On Wednesday, 1/25/23, the DPW contractor will begin milling and paving Chalan Pujitos, weather permitting. Work will occur between the hours of 7:00 AM – 4:00 PM. There will be intermittent lane closures. We encourage residents in the area to exercise caution.