Traffic Updates

Swamp Road Paving to Start Tuesday

September 09, 2022

Islandwide Village Street Pavement Resurfacing – Swamp Road, Dededo

The DPW contractor will begin milling and paving Swamp Road on Tuesday, 9/13/22 instead of Thursday, 9/15/22 as originally scheduled. Work will start in the east at the intersection with Ysengsong and continue westward at a rate of approximately 1500 ft a day. There will be intermittent lane closures.

Residents and motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.