Traffic Updates

Traffic Advisory for the Week of March 18-24

March 20, 2019

Road Safety Reminder for the Week

Traffic Signal Light Not Working (Blackout)

At intersections without traffic control devices, such as STOP or YIELD signs or Traffic Control Signs:

  • The first vehicle in the intersection has the right to go ahead. Keep in mind, however, that it is the responsibility of all drivers to Yield the right-of-way.
  • When two vehicles enter an intersection from different streets or highways at the same time, the vehicle on the left shall Yield the right-of-way to the vehicle on the right. (Motor Vehicle Code of Guam Section 3325).
     

Guam Construction Update

Motorists are reminded to drive cautiously through all construction zones, observe all posted speed limit and construction signs, and carefully heed to flaggers. Alternative routes and/or adjusting drive times when feasible are encouraged.
 

Route 3 Widening

Construction activities are ongoing along Route 3 from just north of Route 28 to just south of Potts Junction. Motorists can expect lane closures and flagger controlled traffic.
 

Route 1 and Route 8 Resurfacing

The DPW contractor, Hawaiian Rock Products, will be working on the following areas between 8:00 AM to 4:30 PM:

Yigo-Dededo

  • From Monday 03/18/19 through Saturday 03/23/19 – pavement work along southbound lanes from Juan Jacinto Drive to AGA Blvd
  • On Saturday 03/23/19 milling and paving along southbound lanes from AGA Blvd to Batullo Road

Route 8/Canada-Toto Loop Intersection

  • From Monday 03/18/19 through Saturday 03/23/19 - excavation and concrete work for traffic signal poles.

Motorists are advised to expect lane closures, lane shifts, and flagger-controlled traffic in these areas.