Traffic Updates

Traffic Advisory for the Week of March 15-21

March 12, 2021

Road Safety Reminder for the Week

PAVEMENT MARKINGS
Pavement markers should indicate to the driver:

  1. Where on the roadway he should be driving.
  2. Where his visibility ahead is limited and passing is restricted.
  3. Where he can expect traffic in the adjacent lane to be going in the opposite direction.
  4. Where he may safely wait for an opportunity to make a left turn.

The COLOR of the lines tells the motorist instantly whether he is on a one-way or two way road:

  1. Yellow lines are used to divide roads with two-way traffic.
  2. White lines divide lanes or roadways where the traffic is going in the same direction.

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3309B Passing Over a Solid Line $80.00
3311 Disobey Roadway Marking $80.00
3314 Improper Lane Usage $80.00
3331 Pedestrian Must Yield (No Crosswalk) $100.00
3332 Jaywalking $100.00

 

 

Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.

Atantano Bridge (Temporary Repairs)

Motorists are advised that construction activities will continue at the Atantano Bridge in Santa Rita next week. The southbound shoulder will be closed.

Route 30 at Trankilo St

During the week of March 15, 2021, the DPW will be restriping the southbound lanes of Route 30 at Trankilo Street. The Route 30 southbound lane will be reduced to one lane in preparation for repair work in the area.

Harmon Industrial Park Roadway Rehabilitation

Hawaiian Rock Products (HRP) will continue construction work on Harmon Industrial Park Road. Motorists are advised that there will be lane shifts and/or intermittent lane closures from 7:00 AM to 5:00 PM.

  • On Wednesday, 3/17/2021, HRP will be milling and paving on both lanes of JL Baker St. One lane will be closed at a time.
  • On Saturday, 3/20/2021, HRP will be milling and paving on both lanes of Guerrero/Hawthorne St. One lane will be closed at a time.
  • On Sunday, 3/21/2021, HRP will be milling and paving on both lanes of Rojas St. One lane will be closed at a time.